REDBRICKPROPERTIESSANCTUARY CEILING RESTORATION PLANNING STUDY

THE RESTORATION STORY · CHAPTER 01

A sacred space.
A careful beginning.

Before the ceiling can be restored, everything below it deserves care. Follow the first week, from protecting the pews to the first look above the plaster.

Explore week one
05working days
25illustrated moments
01careful sequence
Architectural watercolor of the crew gathering in the historic sanctuary
01 / THE MORNING WALKTHROUGHConcept illustration

THE FIRST FIVE DAYS

Sanctuary, week one.

Showing the full week, 25 scenes
01

Monday · DAY 1

Mobilize & Protect

Phase 01 — Interior protection begins

05 SCENES
DAY 1SCENE 1

The morning walkthrough

The foreman brings the six-person crew together to review the sequence, access, and protection of the sanctuary’s historic finishes.

DAY 1SCENE 2

Materials roll in

Protection stock comes through the sanctuary doors all morning — padded blankets, floor board, plastic sheeting, tape, and the first crates of supplies.

DAY 1SCENE 3

Wrapping the pews

Row by row, the landmark pews disappear under padded covers. Each one is wrapped, tucked, and taped — main floor first.

DAY 1SCENE 4

Protecting the floors

Protection board covers the aisles and planned access routes. The crew secures the seams and keeps walking paths clear.

DAY 1SCENE 5

Protecting the stained glass

The crew prepares protective sheeting and padded surrounds for the stained-glass windows, using access appropriate to each location.

REVIEW BEFORE PROCEEDINGProtection review

Confirm the condition record, protected finishes, and clear access routes before moving to overhead work.

02

Tuesday · DAY 2

Power Down & Precious Things

Phases 01–02 — Protection wraps up; electrical disconnect

05 SCENES
DAY 2SCENE 1

The balcony gets the same care

The crew works the balcony level — pews wrapped, rail padded — so both floors are fully protected before anything above them moves.

DAY 2SCENE 2

Isolate & verify

The licensed electrician isolates the affected lighting circuits, applies lockout controls, and verifies the work area before removal proceeds.

DAY 2SCENE 3

Every detail on camera

Before anything comes down, the medallion, vent surrounds, and chandelier are photographed and measured from every angle — the record the rebuild will be matched against.

DAY 2SCENE 4

Lowering the centerpiece

Following the agreed lifting plan, the chandelier is supported and carefully lowered to a padded receiving area for inspection and storage.

DAY 2SCENE 5

Crated with care

Removed fixtures and decorative components are documented, padded, labeled, and crated. Each item keeps its identity for later reinstatement.

REVIEW BEFORE PROCEEDINGElectrical & lifting review

Verify isolation, removal arrangements, and the inventory of stored components before scaffold work proceeds.

03

Wednesday · DAY 3

The Scaffold Takes Shape

Phase 03 — Scaffold platform erection begins

05 SCENES
DAY 3SCENE 1

The scaffold arrives

Frames, braces, and planks stage in the aisle — the raw parts of a 4,900-square-foot platform, stacked and counted.

DAY 3SCENE 2

A careful foundation

Sills and base plates sit on the protected floor between the wrapped pews. Locations and support are checked against the scaffold plan.

DAY 3SCENE 3

First scaffold bays

The first lift of tubular scaffold frames goes vertical. Two builders work opposite ends, connecting cross-braces as the first bays take shape.

DAY 3SCENE 4

Building the next scaffold lift

Lightweight tubular scaffold frames and cross-braces are passed up and fitted to the first lift, continuing the same scaffold upward.

DAY 3SCENE 5

The day’s inspection

The scaffold crew reviews alignment, connections, bracing, and incomplete areas. Access stays restricted until the appropriate inspection and release.

REVIEW BEFORE PROCEEDINGErection review

Keep incomplete scaffold areas restricted. Confirm the next lift with the scaffold team.

04

Thursday · DAY 4

The Platform Tops Out

Phase 03 — Scaffold reaches ceiling height

05 SCENES
DAY 4SCENE 1

Continuing scaffold erection

The crew continues the connected tubular scaffold across the sanctuary’s full length and width, adding lifts until its top reaches ceiling working height.

DAY 4SCENE 2

Decking the dance floor

Temporary flooring is laid across the top of the scaffold to form the “dance floor” — one continuous work platform spanning the sanctuary’s full length and width, with access to the entire ceiling.

DAY 4SCENE 3

Protecting the edges

Guardrails, midrails, and toe boards are installed around the working deck. Openings and access points are checked before use.

DAY 4SCENE 4

The scaffold stair tower

A temporary stair tower assembled from scaffold components gives the crew access from the sanctuary floor to the dance-floor work platform.

DAY 4SCENE 5

Inspection before access

The designated competent person inspects the full-room scaffold and the continuous dance-floor deck above it. The platform opens for work only after required checks and release.

REVIEW BEFORE PROCEEDINGPlatform release

Complete the required scaffold inspection before the deck is released for use.

05

Friday · DAY 5

At the Ceiling

Phase 04 prep — Demolition setup and the first look inside

05 SCENES
DAY 5SCENE 1

A floor in the sky

The planned 4,900-square-foot dance floor spans the full length and width of the sanctuary on top of the scaffold, bringing the crew within working reach of the entire ceiling.

DAY 5SCENE 2

Lights & temporary power

Temporary lighting and protected power supplies prepare the deck for work, with installation and checks coordinated by the electrician.

DAY 5SCENE 3

A controlled route for debris

A sectional chute at the edge of the scaffold-supported dance floor leads down to a covered receiving container, providing a controlled route for debris.

DAY 5SCENE 4

Ready for the next stage

Containment and appropriate protective equipment are prepared. Intrusive work stays on hold until material results and required clearances are reviewed.

DAY 5SCENE 5

First look inside the attic

Once material clearance and approval are in place, the crew investigates the framing above from the continuous dance-floor platform. The findings inform the repair scope for week two.

REVIEW BEFORE PROCEEDINGMaterial clearance

Review test results and authorize the investigation before any intrusive ceiling work.

THE NEXT CHAPTER

Understand what’s above.
Then plan what comes next.

Week one creates access and protects the sanctuary. What the investigation reveals will shape the repair scope and the sequence for week two.

WEEK ONE / DAY 1 · Monday
The morning walkthrough

SCENE 01 OF 25 · CONCEPT ILLUSTRATION

The morning walkthrough

The foreman brings the six-person crew together to review the sequence, access, and protection of the sanctuary’s historic finishes.

1 / 25